Claydon Court, Suffolk Office Development


Claydon Court, Suffolk Office Development

Property improvement specialistSEH Commercialbrings experience and innovation to clients’ project and, through its position as part of the SEH Group of companies, can provide a complete construction package suited to any project.

The full scale and benefits of this co-operative and co-ordinated approach are being made apparent in an on-going project in Ipswich at the Claydon Court office complex, the transformation and modernisation of which is being managed by SEH Commercial Ltd.

Originally the barn and cart lodges of a dairy farm on the Old Ipswich Road, in Claydon, Claydon Court was developed into offices by a London auction house in the 1980s with little regard to energy efficiency. Original block walls along with plywood and minimal polystyrene insulation had been utilised to create office space that was externally clad with timber weather boarding.

Claydon Court’s current owner, Richard Parker, purchased the property in 1998 from an air conditioning company that had been based in the buildings and which had installed its units throughout. Richard explains: “The same air conditioning system remains in the property today but is now outdated, energy inefficient and overly expensive to operate and maintain and its replacement has been one of the main drivers for change.”

“The premises are home to several companies – a software developer, a charity and a recruitment consultancy as well as three companies that are part of the Strident group of companies. There are about forty people working here. Improvements have become a necessity; the building is too hot in warmer weather and under-insulated in colder periods, there is a clear requirement for improved efficiencies.”

In 2009, Richard met Julian Pennington from SEH Commercial him survey Claydon Court. Julian describes the scale of the project:

“Richard was keen to find ways in which he could reduce energy consumption at Claydon Court to minimise costs and his Carbon Footprint. The project brief was to create the best value energy efficient building utilising the newly introduced Energy Performance Certificate (EPC) ratings.”

“It was agreed that we would develop the project to improve the building’s EPC rating from a current F rating to a B rating utilising the most cost effective methods. Not only would this reduce the overall carbon emissions from the building but it would also result in lower operational costs for the occupiers. The building would therefore become more attractive to prospective tenants and the space would be more demanded, allowing Richard as the landlord, to extend the building and create further quality office accommodation for the existing tenants and to attract new tenants to the offices.”

“As project manager for the whole development, we were responsible for all aspects. In a ‘live’ office environment we deal with existing landlord and tenant issues to ensure no disruption to services and function. We are extending the premises to provide an extra 1,471ft2 and have handled the land acquisition and planning application having appointed and worked with the architect Barefoot Gilles to design the extension; the co-ordination and integration of the new-build design has been carefully managed along with the refurbishment of the existing building.”

SEH Commercial also acted in the appointment of the CDM co-ordinator for the project and organised the structural engineer’s soil survey, foundation design, asbestos survey and compliance with building regulations.

Highlighting the convenience of the using the SEH solution, the principle building contractor for the new build element of the project is SEH French Construction Ltd. By using a sister company, SEH Commercial can ensure swiftness of delivery, has the assurance of knowing that the contractor is professional, skilled and reliable and can maintain strong communications to make sure things are done on schedule and to budget. The input from the contractor from the inception stage of the project has ensured design and build issues are covered from the outset to avoid nasty surprises.

Energy Efficiency

SEH Commercial is undertaking the energy efficiency improvements to the existing building and are able to apply techniques and knowledge to the whole building and contribute to the design phase of the new extension whilst also focussing on the commercial realities of the project.

SEH Commercial is removing the external weatherboarding to install an effective insulation solution throughout with minimal disruption to the occupiers.

The heating and ventilation systems of the building are to be completely replaced; the new system has been designed to provide flexibility in the use of the building as well as reducing energy consumption. Additional windows are to be installed within the external fabric of the building to provide additional natural ventilation.

Large glazed areas overlooking the south facing courtyard are responsible for significant solar gain within the offices which will be significantly reduced by the installation of a timber framed Pergola. Not only will the offices benefit from the solar shading that is created by the Pergola, but it will also improve the aesthetic appeal of the building as plants such as Honey Suckle and Clematis will adorn the frame creating an attractive work environment.

In addition to the insulation and HAVC solutions, SEH Commercial is also converting the internal lighting to ensure that fittings and lamps are all highly energy efficient and install an automated energy management system that will record the energy consumption of the building so that it can be actively managed.

RELATED PROJECTS

Past & Present Projects


x

We use cookies to give you the best online experience. By agreeing you accept the use of cookies in accordance with our cookie policy.

I accept I decline Privacy Center Privacy Settings Learn More about our Cookie Policy